Mike Amodeo (Contractors) Limited supplied and installed over 80,000m² of powerfloated concrete flooring. The project consisted of ground floor slabs and multi level structural toppings to Aircraft Hangers and support Buildings.Up to 500 cubic metres per day was placed into the ground floor Hanger Slabs which were laid to FM2 flatness using our Somero S160 Laser Screed and finished with a dry shake topping applied using our Somero STS 130 Topping Spreader. |
|
 |